Skip to content
In seasonDormant seeding: book your date before the ground freezes

Hydroseeding in Dorval

A new lawn, a yard to redo or a slope to stabilize in Dorval: we prepare the soil if needed, spray seed, mulch and fertilizer in a single pass, and plan the watering with you.

New lawn in Dorval

Watering permit
Free permit
For seeding
15 days, allowed hours
Germination
7 to 10 days
First mowing
4 to 6 weeks

The rules in detail

Watering a new lawn in Dorval

In Dorval, a new lawn, seeded or sodded, can be watered every day for the 15 days following installation, with a free permit from the Service de l'aménagement urbain (urban planning department). This watering is done during the allowed hours, except on the day sod is installed, when it's allowed at any time. Proof of purchase of the seed or sod is required to get the permit. From June 1 to September 1, sprinklers and soaker hoses are allowed from 5 a.m. to 7 a.m. and from 7 p.m. to 11 p.m., three days a week depending on the address; before and after this period, the bylaw allows them at any time. Automatic sprinklers are allowed from 2 a.m. to 5 a.m., when it isn't raining.

Source: City of Dorval (in French), bylaw RCM-79-2020 on the use of drinking water, ss. 3.2, 3.3, 3.4 and 14 (adopted February 17, 2020, in force February 26, 2020). Summary checked in November 2026. Bylaws change: confirm with the city before seeding.

Permit
Free permit from the Service de l'aménagement urbain. Proof of purchase of the seed or sod is required for the permit to be issued.
Duration
15 days following installation, every day.
Hours
During the hours of the regular schedule (ss. 3.2 and 3.3). Sprinklers and soaker hoses: from 5 a.m. to 7 a.m. and from 7 p.m. to 11 p.m. from June 1 to September 1, when it isn't raining; at any time before June 1 and after September 1. Automatic sprinklers: from 2 a.m. to 5 a.m., when it isn't raining. Sod: at any time on the day it's installed.
Regular schedule
Sprinklers and soaker hoses, from June 1 to September 1: from 5 a.m. to 7 a.m. and from 7 p.m. to 11 p.m., when it isn't raining; even civic numbers: Monday, Wednesday and Friday; odd: Tuesday, Thursday and Saturday. Before June 1 and after September 1, they're allowed at any time. Automatic sprinklers: from 2 a.m. to 5 a.m., when it isn't raining. The bylaw sets neither days nor a period for them; the City's web page, however, applies the even and odd days to them, from June 1 to September 1.
Restrictions
Sprinklers and soaker hoses: restricted schedule from June 1 to September 1. In case of a water shortage or emergency, council can declare additional bans by resolution; the bylaw doesn't provide for an exception for new lawns in that case.
How to apply
Online application at dorval.edemandes.com; the permit is sent by email. Information: 514-633-4040.

We set the application date with you so that the permit fully covers germination.

The permit, compliance with the city's watering rules and any fine, if applicable, are the customer's responsibility. Before the work, ask the city for authorization to water according to the seed's needs, which change with the season: in July, at 35°C, a new lawn can need 7 or 8 waterings in a single day. To be covered by our guarantee, you have to be able to water as often as necessary, even during the day. Guarantee details.

The price in Dorval

Prices before taxes. Soil preparation and watering aren't included, except in the Premium package.

Estimate your price in Dorval

Seeds
Package

Our seeds are included in every package.

5,000 sq. ft. (465 m²)
1,000 sq. ft.30,000 sq. ft.
sq. ft.

Standard package · 5,000 sq. ft. · Dorval

$1,718

before taxes · $1,975 including taxes

Price per sq. ft.
$0.34

Estimate for the centre of Dorval. Not included: soil preparation, watering and the municipal permit.

Get my price

Premium package (topsoil, temporary irrigation and guaranteed germination): custom quote. Compare the packages

Assessment of the property, soil preparation if needed, application in a single pass, then watering according to the seed's needs: see how it works.

A project in Dorval?

Send us the area and a few photos of your property: we'll call you back, then you'll receive a clear price in writing, plus taxes.