Skip to content
In seasonDormant seeding: book your date before the ground freezes

Hydroseeding in Delson

A new lawn, a yard to redo or a slope to stabilize in Delson: we prepare the soil if needed, spray seed, mulch and fertilizer in a single pass, and plan the watering with you.

New lawn in Delson

Watering permit
Permit required
For seeding
6 days, at night
Germination
7 to 10 days
First mowing
4 to 6 weeks

The rules in detail

Watering a new lawn in Delson

In Delson, a permit issued by the City allows a new lawn (sod, rolled turf or seed over more than 6 m²) to be watered outside the regular schedule. It allows watering from 10 p.m. to 6 a.m. for 6 consecutive days at most, and at any time on the day it's issued, for 4 hours at most. Only one permit is issued per calendar year, and it must be posted so it's visible from the street. At the red level, all outdoor use of water is banned, even with a permit. The cost of the permit isn't published online.

Source: City of Delson (in French), bylaw 729 on the outdoor use of drinking water, s. 9 (adopted October 10, 2023). Summary checked in November 2026. Bylaws change: confirm with the city before seeding.

Permit
Permit issued by the City, required to water a new lawn according to the permit schedule: sod, rolled turf or seed on soil over more than 6 m² (ss. 2 and 9). Only one permit per calendar year. It must be posted so it's visible from the public road for its full duration. Cost not published online: neither bylaw 729 nor the 2026 rate bylaw (No. 750) mentions it.
Duration
6 consecutive days at most, following the date the permit is issued (s. 9).
Hours
On the day it's issued: at any time, until 6 a.m. the next day, 4 hours at most. After that: from 10 p.m. to 6 a.m. (s. 9).
Regular schedule
Level 1 (green, by default): mechanical, sprinkler or automatic-system watering from 10 p.m. to midnight, on even dates for even addresses and odd dates for odd addresses (s. 6). On June 17, 2026, the City announced that this bylaw would soon be amended to limit watering to once a week; no amendment had been adopted at the October 13, 2026 meeting (latest minutes online).
Restrictions
From April 1 to October 1, the City can declare a restriction level by public notice (s. 4). At level 2 (yellow), mechanical, sprinkler or automatic watering is banned, except for holders of a new-lawn permit (s. 7). At level 3 (red), all outdoor use of water is banned, even with a permit (s. 8).
How to apply
No application process specific to this permit is published online. For permits in general, the City's Permis et certificats page offers an online application (delson.edemandes.com), 450-632-1050, ext. 3315, and urbanisme@ville.delson.qc.ca.

We check the applicable rules with you before setting the application date.

The permit, compliance with the city's watering rules and any fine, if applicable, are the customer's responsibility. Before the work, ask the city for authorization to water according to the seed's needs, which change with the season: in July, at 35°C, a new lawn can need 7 or 8 waterings in a single day. To be covered by our guarantee, you have to be able to water as often as necessary, even during the day. Guarantee details.

The price in Delson

Prices before taxes. Soil preparation and watering aren't included, except in the Premium package.

Estimate your price in Delson

Seeds
Package

Our seeds are included in every package.

5,000 sq. ft. (465 m²)
1,000 sq. ft.30,000 sq. ft.
sq. ft.

Standard package · 5,000 sq. ft. · Delson

$1,569

before taxes · $1,804 including taxes

Price per sq. ft.
$0.31

Estimate for the centre of Delson. Not included: soil preparation, watering and the municipal permit.

Get my price

Premium package (topsoil, temporary irrigation and guaranteed germination): custom quote. Compare the packages

Assessment of the property, soil preparation if needed, application in a single pass, then watering according to the seed's needs: see how it works.

A project in Delson?

Send us the area and a few photos of your property: we'll call you back, then you'll receive a clear price in writing, plus taxes.