Hydroseeding in Chambly
A new lawn, a yard to redo or a slope to stabilize in Chambly: we prepare the soil if needed, spray seed, mulch and fertilizer in a single pass, and plan the watering with you.
In 2026, we hydroseeded properties for the City of Chambly.
New lawn in Chambly
- Watering permit
- Free permit
- For seeding
- 15 consecutive days
- Germination
- 7 to 10 days
- First mowing
- 4 to 6 weeks
Watering a new lawn in Chambly
In Chambly, a free watering permit is required to water a new lawn. Bylaw 2026-1537 then allows watering during the set hours for 15 consecutive days after seeding or sod installation begins. From May 1 to September 30, watering lawns is allowed from 8 p.m. to midnight, on Saturday for even addresses and on Sunday for odd addresses. The full text of the bylaw isn't accessible online: the watering days allowed during the permit and the effect of a ban aren't confirmed.
Source: City of Chambly (in French), bylaw 2026-1537 on watering and the use of drinking water (adopted March 17, 2026), PDF inaccessible: excerpts shown by the website's search; bylaw 2017-1353 on permits and certificates, s. 47; Permis and Eau potable pages (consulted November 6, 2026). Summary checked in November 2026. Bylaws change: confirm with the city before seeding.
- Permit
- Certificate of authorization required before watering a new lawn (bylaw 2017-1353 on permits and certificates, s. 47); bylaw 2026-1537 refers to a permit from the designated officer. Free (City's Permits page). Issued by the Service de l'urbanisme, de l'environnement et du développement économique (planning, environment and economic development department). The Permits page says “permit required between May 1 and September 1”, but bylaw 2026-1537 regulates watering from May 1 to September 30.
- Duration
- 15 consecutive days after seeding or sod installation begins (excerpt from bylaw 2026-1537 shown by the City website's search).
- Hours
- “Aux heures précitées” (during the hours set out above) in bylaw 2026-1537; the only lawn watering time slot visible in the excerpts of the bylaw is from 8 p.m. to midnight, and automatic systems are limited to 2 a.m. to 5 a.m. The bylaw's PDF is inaccessible: the watering days allowed during the permit and any rule for the first day aren't confirmed.
- Regular schedule
- From May 1 to September 30: lawn from 8 p.m. to midnight, on Saturday for even addresses and on Sunday for odd addresses; automatic system from 2 a.m. to 5 a.m., same days (Eau potable page and excerpts from bylaw 2026-1537).
- Restrictions
- No outdoor watering, filling or washing is allowed during a drought; you must follow the notice issued by the City (Eau potable page). The effect of a ban on a permit in progress isn't published online.
- How to apply
- Online application in Espace Chambly (espacechambly.ca) or in person at the Service de l'urbanisme, de l'environnement et du développement économique, 56, rue Martel: 450-658-0537, permis@ville.chambly.qc.ca. The application states the planned watering dates (bylaw 2017-1353, s. 48). The permit is sent by email; the process usually takes one to two weeks.
We check the applicable rules with you before setting the application date.
The permit, compliance with the city's watering rules and any fine, if applicable, are the customer's responsibility. Before the work, ask the city for authorization to water according to the seed's needs, which change with the season: in July, at 35°C, a new lawn can need 7 or 8 waterings in a single day. To be covered by our guarantee, you have to be able to water as often as necessary, even during the day. Guarantee details.
The price in Chambly
Prices before taxes. Soil preparation and watering aren't included, except in the Premium package.
Estimate your price in Chambly
View the technical data sheet (PDF, in French)
136 Gloco and Aiglon Indigo mixes: shade, salt, clover, wildflowers, slopes, wetlands… The price adjusts to the mix you choose.
Several mixes: we must wash the machine between each kind of seed. The washing is included in the price.
Types from the CCDG of Québec’s Ministère des Transports et de la Mobilité durable. H3 and H4 are for slopes: measure the area along the slope.
Standard package · 5,000 sq. ft. · Chambly
$1,684
before taxes · $1,936 including taxes
- Price per sq. ft.
- $0.34
Estimate for the centre of Chambly. Not included: soil preparation, watering and the municipal permit.
Prices are subject to change based on the specifications. We recommend requesting an official quote with your plans and specifications attached. We can also supply the soil and do the grading, at an extra cost.
Premium package (topsoil, temporary irrigation and guaranteed germination): custom quote. Compare the packages
Assessment of the property, soil preparation if needed, application in a single pass, then watering according to the seed's needs: see how it works.
A project in Chambly?
Send us the area and a few photos of your property: we'll call you back, then you'll receive a clear price in writing, plus taxes.