Skip to content
In seasonDormant seeding: book your date before the ground freezes

Hydroseeding in Bedford

A new lawn, a yard to redo or a slope to stabilize in Bedford: we prepare the soil if needed, spray seed, mulch and fertilizer in a single pass, and plan the watering with you.

New lawn in Bedford

Watering permit
No permit mentioned
For seeding
15 consecutive days
Germination
7 to 10 days
First mowing
4 to 6 weeks

The rules in detail

Watering a new lawn in Bedford

In Bedford (town), according to the Town's “Eau et arrosage” page, a new lawn can be watered every day for 15 consecutive days following the start of seeding, planting or sod installation. This watering can be done with a movable sprinkler, a soaker hose or an automatic system, and the page doesn't specify hours for this exception. Normally, a movable sprinkler or soaker hose is allowed from 8 p.m. to 11 p.m. and an automatic system from 3 a.m. to 6 a.m., on even dates for even addresses and odd dates for odd addresses. The page mentions no permit, no seasonal period and no rule during a ban, and the bylaw containing these rules isn't published online.

Source: Town of Bedford (in French), “Eau et arrosage” page, “Règlement sur l'arrosage” section (bylaw number and sections not indicated; bylaw not published online). Summary checked in November 2026. Bylaws change: confirm with the city before seeding.

Permit
No permit mentioned on the Town's page. Bylaw not published online.
Duration
15 consecutive days following the start of seeding, planting or sod installation.
Hours
Every day, with a movable sprinkler, a soaker hose or an automatic system. Hours not specified for the new lawn (“Malgré les horaires ci-dessus”, notwithstanding the schedules above).
Regular schedule
Movable sprinkler or soaker hose: from 8 p.m. to 11 p.m. Automatic system: from 3 a.m. to 6 a.m. On even dates for even addresses and odd dates for odd addresses.
Restrictions
Not published online: the Town's page specifies neither a seasonal period nor measures during a ban. Watering water must not flow into the street or onto a neighbouring property.
How to apply
No application indicated. Information: Town of Bedford, 450-248-2440, info@ville.bedford.qc.ca.

We check the applicable rules with you before setting the application date.

The permit, compliance with the city's watering rules and any fine, if applicable, are the customer's responsibility. Before the work, ask the city for authorization to water according to the seed's needs, which change with the season: in July, at 35°C, a new lawn can need 7 or 8 waterings in a single day. To be covered by our guarantee, you have to be able to water as often as necessary, even during the day. Guarantee details.

The price in Bedford

Prices before taxes. Soil preparation and watering aren't included, except in the Premium package.

Estimate your price in Bedford

Seeds
Package

Our seeds are included in every package.

5,000 sq. ft. (465 m²)
1,000 sq. ft.30,000 sq. ft.
sq. ft.

Standard package · 5,000 sq. ft. · Bedford

$1,919

before taxes · $2,206 including taxes

Price per sq. ft.
$0.38

Estimate for the centre of Bedford. Not included: soil preparation, watering and the municipal permit.

Get my price

Premium package (topsoil, temporary irrigation and guaranteed germination): custom quote. Compare the packages

Assessment of the property, soil preparation if needed, application in a single pass, then watering according to the seed's needs: see how it works.

A project in Bedford?

Send us the area and a few photos of your property: we'll call you back, then you'll receive a clear price in writing, plus taxes.